Smart Table to PGDB
I am using Pathway Tools v. 24.5 to build a PGDB of an organism that I'm interested in. I manually revised pathways in this PGDB and have a list, formatted as a Smart Table, of pathways I wish to keep after removing what I regarded as false positive pathways. However, I have not found a way to perform some sort of intersection between all pathways in the PGDB and those I wish to keep (in the Smart Table object). Is there a way to do this within Pathway Tools?
Thank you.